FM 494
New construction and widening from SH 107 to FM 676 (Mile 5) — a full-scope corridor delivered sidewalks-to-signals by Texas Cordia.
Project


Project Overview
FM 494 — Roadway Construction & Widening
FM 494 was one of our most comprehensive corridor builds in recent years: construction and widening of a non-freeway facility from SH 107 south to FM 676 (Mile 5), delivered as a single, self-performed scope.
The job included grading; storm sewer and drainage structures; concrete curb and gutter; lime-treated subgrade; flexible base; asphaltic concrete pavement; wheelchair ramps and sidewalks for ADA compliance; pavement markings; signing; and traffic signals.
FM 494 is the kind of project Texas Cordia is built for — a long, multi-discipline corridor that rewards tight scheduling, sequencing, and safety culture at every stage.
Ready to start your project?
Contact our estimating team for a competitive bid.
Project Gallery